Eversource completed their work to move the power lines from the back of the hall to the front. This allowed us to remove the power pole in the back of the hall, which was right in the way of the new kitchen addition.

With that removed, the old oil tank moved, and the shed shifted out of the way, the visible work could finally begin!

kitchen_truck_church_800

(click to enlarge)

The excavator was brought on site, and digging has commenced:

(click to enlarge)

(click to enlarge)

(click to enlarge)

(click to enlarge)

It’s amazing that the final product will eventually look like this:

(click to enlarge)

(click to enlarge)

Stay tuned for more updates!